The Detailing & Envelope Cycle.

PHASE 01

Diagnostic Testing & Scanning

Conducting site-wide thermographic scans, non-destructive moisture mapping, and water-penetration tests to locate envelope weaknesses.

Diagnostic Stack
Infrared Thermography
Nuclear Moisture Meters
PHASE 02

CAD Detailing & Barrier Design

Engineering robust joinery details to guarantee structural water barriers, continuous air flow lines, and zero vapor pockets at transition points.

Engineering Stack
AutoCAD Transition Details
Hygrothermal Modeling
PHASE 03

Facade Stabilization & Membranes

Executing targeted masonry repairs, deep structural repointing, and installing self-adhered high-performance vapor-permeable air barriers.

Execution Stack
Self-Adhered Membranes
Breathable Lime Grouts
PHASE 04

Adhesion Testing & Final Seal

Validating membrane adhesion through strict on-site pull-off tests and finalizing perimeter seals to establish water-tight structural permanence.

Verification Stack
ASTM Adhesion Tests
3rd Party Consultant Sync

Thermal Permanence.

We eliminate structural deterioration and drafts by executing high-accuracy envelope details, lowering overall facility operation costs by up to 35%.

100% Vapor Shield
30+ YR System Life